Photo Albums
2008-02-19 Preparing for Painting
Images: 9
Created by: feldgendler
Leveling the cabinet surface before painting.
2008-01-25 It Works!
Images: 23
Created by: feldgendler
Making ventilation holes; installing side buttons; first game!
2008-01-23 Putting It All Together
Images: 21
Created by: feldgendler
Finishing the controller board assembly; installing rear sockets; installing the computer.
2008-01-22 More Controller Board Contsruction
Images: 18
Created by: feldgendler
Cutting the figured slot for the trackball; assembling the controller board.
2008-01-21 Controller Board Construction
Images: 18
Created by: feldgendler
Working on the controller board design; cutting holes in the controller board for buttons and trackball.
2008-01-18 More Cabinet Assembly
Images: 9
Created by: feldgendler
Installing the keyboard door and the plexiglass top.
2008-01-16 Installing the Speakers
Images: 13
Created by: feldgendler
Completing the sound system installation.
2008-01-14 Cabinet Assembly
Images: 25
Created by: feldgendler
Finishing the cabinet assembly in the Desktop Team office.
2008-01-12 Cabinet Construction
Images: 41
Created by: feldgendler
Making the wooden parts of the cabinet in George's garage.
Photo albums
- 2008-02-22 Second Coat
- 2008-02-21 First Coat
- 2008-02-20 Priming
- 2008-02-19 Preparing for Painting
- 2008-01-25 It Works!
- 2008-01-23 Putting It All Together
- 2008-01-22 More Controller Board Contsruction
- 2008-01-21 Controller Board Construction
- 2008-01-18 More Cabinet Assembly
- 2008-01-16 Installing the Speakers
- 2008-01-14 Cabinet Assembly
- 2008-01-12 Cabinet Construction