1316 Ninth Street, NW: Update
Tuesday, July 15, 2008 7:02:44 PM
Yesterday, that Stop Work was taken down. Here's why:
Yesterday, HPO said:
The applicant, after having presented to and convinced HPRB that the carriage house was structurally unsound, obtained a DC building permit to replace the structure. The Stop Work has been lifted because the applicant is found to have been in compliance with the original permit.
The applicant's plans for renovation include a reconstruction of the carriage house to its original height, footprint, and design.
Yesterday, HPO said:
The applicant, after having presented to and convinced HPRB that the carriage house was structurally unsound, obtained a DC building permit to replace the structure. The Stop Work has been lifted because the applicant is found to have been in compliance with the original permit.
The applicant's plans for renovation include a reconstruction of the carriage house to its original height, footprint, and design.






